Picture 40: First installation step: Installation of RoomStone® mounting parts on formwork on the side of the stairs
Picture 41: First installation step: Installation of RoomStone® mounting parts on formwork on the side of the stairs
Picture 42: Second step: reinforcements
Picture 43: Finishing up before formwork is sealed
Picture 48: Finished wall prior to installation of RoomStone® concrete step. The steps are hung with a gap.
Picture 51: Important: Distance between stair and wall (ceiling opening, etc.) > 5cm
Picture 47: View of a RoomStone® temporary construction staircase
Picture 70: System image: component, temporary steel stair and finished RoomStone® fair-faced concrete stair
Picture 49: Below: Mounting of RoomStone® concrete stairs below, above: not yet affixed, temporary RoomStone® construction stair
Picture 52: RoomStone® staircase after installation
Picture 50: RoomStone® staircase after installation. Stairs will be plastered in by plasterer.
Picture 71: Mounting of a RoomStone® base
Picture 34: RoomStone® installation Markus Brück.
Picture 53: Cover RoomStone® staircase before leaving construction site
Picture 55: Installation of fireplace base made with 3cm textile concrete
Picture 56: Mounted RoomStone® fireplace base made with 3cm textile concrete